I-75 Gaylord East-West Crossing Study


THESE PDF FILES OPEN IN A NEW BROWSER WINDOW.

 
Final Report Cover (1.18MB)
 
Final Report (4.5MB)
Figure 1 - Study Area (1.14MB)
 
Figure 2 - Existing Road Classifications (1.16MB)
Figure 3 - Existing Traffic Volumes (1.18MB)
 
Figure 4 - Primary Existing Origins and Destination (1.15MB)
 
Figure 5 - Existing Peak Hour Level of Services UPDATED JAN 2 (310kb)
 
Figure 6 - Classifications for Existing E-W and N-S Traffic (339kb)
 
Figure 7 - 1999 Crash Locations (381kb)
 
Figure 8 - 1998 Crash Locations (379kb)
 
Figure 9 - 1997 Crash Locations (382kb)
 
Figure 10 - Primary Future Origins and Destinations (344kb)
 
Figure 11 - 2015 Peak Hour Level of Service (Low Growth Scenario) (309kb)
 
Figure 12 - 2015 Peak Hour Level of Service (High Growth Scenario) (304kb)
 
Figure 13 - 2025 Peak Hour Level of Service (Low Growth Scenario) (304kb)
 
Figure 14 - 2025 Peak Hour Level of Service (High Growth Scenario)  (303kb)
 
Figure 15 - Alt1 Layout1 (10.1MBkb)
 
Figure 16 - Alt2 Layout1 (9.43MB)
 
Figure 17 - Alt3 Layout1 (12.2MB)
 
Figure 18 - Alt4 Layout1 (13.4MB)
 
Figure 19 - Alt5 Layout1 (7.36MB)
 
Figure-20 - Roundabout Rend (311kb)
 
Figure-21 - Interchange Rend (417kb)